ETAPA | MONTO CONTRATO (UF) | Nº CASAS | M2 CONSTRUIDOS | MONTO CONTRATO (UF) | M2 PAVIMENTACIÓN | M3 MOVIMIENTO DE TIERRAS | HECTÁREAS URBANIZADAS | MANDANTE | FECHA | |
LOTE A13-A | UF 138.314,65 | 50 | 6.223,66 | UF 22.886,22 | 3.288,00 | 11.973,67 | 2,00 | Inmobiliaria Lo Campino | 2017 – 2018 | |
LOTE B11 | UF 220.938,41 | 96 | 9.391,99 | UF 34.462,61 | 4.123,00 | 16.765,49 | 3,56 | Inmobiliaria Lo Campino | 2017 – 2018 | |
UF 359.253 | 146 | 15.616 | UF 57.349 | 7.411 | 28.739 | 5,56 |